Project Details

Project Type: Industrial
Location: Turkey
Project Status: Ongoing
Project Name: Socar Refectory Building
Project Location: Aliaga / Izmir / Turkey
Total Area: 7.000 m2
Project Start / Finish: 2019
Project Scope: Electrical and Mechanical Works
Employer: ALEYRA CONSULTING & CONSTRUCTION

The scope of these contracts, the design of all materials and equipment, including all necessary determinations and determinations related to construction, interior designs, drawings, selections, procurement, supply and delivery, installation, commissioning, testing and performance calculations are all successful. made. Internal works are in the form of fine works, electrical and mechanical works.

Electrical and Mechanical Works

Hydrotechnical Installation
Garden Irrigation system
Mechanical Piping (Clean Water Supply, Waste and Rainwater, Heating and Cooling Systems)
Ventilation ducts
Installation of All HVAC Equipment and Related Parts
Fire Fighting and Installation
AG and ELV System Infrastructure
Building Automation System
MV and LV Equipment (MDP, EMDP, UPS, MV Generators, Switchgear, etc.)
ELV System Installation (Fire Detection, Data / Telephone, IPTV, CCTV etc.)